Plantation sets no fixed projection cap, so every lift is reviewed for its own canal. We prepare a complete plan, coordinate the City and the water-control authority, and build only once both have signed off.
Minimum lift side setback
Projection set in City review
Warning flag on a submerged cradle
Code summary last verified
“Marc came through with an excellent job on this lift. It’s hard to find a boss who works with his crew. Great service and quick install. Definitely will be dealing again in the future. Thanks guys.”
“Boat lift installers did a phenomenal job at a great and fair price. And delivered on all of their promises. Marc and crew are high quality , high integrity guys for sure”
“It is a pleasure to write this review. Marc is an excellent professional who is knowledgeable, dedicated, and highly focused. He is a pleasure to work with, and you will be very pleased with your decision to choose him and his company.”
“Marc and his team were communicative, professional, and informative throughout the whole process for my lift. The price was great, and the whole process was surprisingly seamless and stress free. I would recommend to anyone looking for a boat lift or dock.”
“Marc and his team did a great job installing a 15KLB lift for me within the schedule I gave him and on budget. I'm very happy with the work they provided and would highly recommend if you're in the market for a new lift.”
“Would recommend Boat Lift Installers LLC. 10/10 times. Very professional and knowledgeable with lots of experience in the boat lift industry. Recently had a 50,000 lb hurricane lift installed for a large center console and it has worked flawlessly. Mark and his team are punctual, precise, and always available to help and answer questions.”
“Always ready / fast quote/ fast execution… I have good service with Mark, He do my maintenance periodically, I ‘m very happy with him!!”
“Marc always does a great job making sure my lift is at peak performance!”
“They did my lift in Ft. Lauderdale I wouldn’t recommend anyone else! Very respectful when I was asking him questions too!”
Plantation waterfront can sit on a tidal canal or on a drainage-district or water-control waterway, where the City and another authority both have a say. A complete plan submitted once avoids rounds of back-and-forth. That is where we start.
Lifts with plans showing foundation design, lift capacity and vessel dead weight.
Docks planned with water-control easements and navigation clearance in mind.
Seawall and shoreline repair, with the governing standard confirmed for your address.
Six-month service for cables, motors, bunks, pilings and electrical, documented every visit.
“Marc and his team were communicative, professional, and informative throughout the whole process for my lift. The price was great, and the whole process was surprisingly seamless and stress free. I would recommend to anyone looking for a boat lift or dock.”
Jon K. · Boat lift customer
Plantation regulates lifts under City Code Chapter 15, especially Sections 15-71 through 15-74 for tidal waterways. The code sets a 5-ft side setback but no canal-width percentage or numeric maximum for the lift or vessel. Final placement is established during City review, together with the authority that controls the canal or drainage easement.
How to read the table below
| Your situation | The rule | What it means for you |
|---|---|---|
| Space from your neighbors | At least 5 ft | The closest part of the lift or davit stays 5 ft from each side property line. |
| How far the lift reaches | No fixed city limit | The city reviews your actual layout instead of a formula, so we submit the real footprint, raised and lowered. |
| A cradle more than 5 ft out underwater | Allowed with a warning flag | A flag marks the cradle’s outer edge, at least 1 ft above mean high tide. |
| How far the boat reaches | No fixed city limit | The plan shows your boat and keeps room for boat traffic and water control. |
| Lift plans | Must show the lift’s capacity and the boat’s weight | Plans also show the foundation design. |
| Permit | Required before building | A city building permit, plus any water-control or outside agency approval. |
Plantation does not limit a lift to 5 ft of projection. Five feet is the minimum side setback and the point where a submerged cradle needs a warning flag. Because the code has no standard projection percentage, your lift and vessel are reviewed for your specific canal before installation.
| Waterway | Automatic lift allowance | What to expect |
|---|---|---|
| 40 ft non-tidal | None stated | City plus controlling drainage or water-control district review. |
| 60 ft tidal | None stated | 5-ft side setback; flag if a submerged cradle extends beyond 5 ft. |
| 80 ft tidal | None stated | Same city rule; the actual lift and vessel envelope is reviewed. |
| 100 ft tidal | None stated | No 20%, 25% or fixed-distance allowance appears in Sec. 15-71. |
| 120 ft tidal | None stated | Wider water does not create an automatic city allowance. |
Plantation reviewers look for these items on every lift plan. We put each one on paper during your consultation, so the design you approve is the design that gets permitted.
Surveyed side property lines.
Outer edge of the seawall cap.
Width and tidal or non-tidal status.
Each lift piling, located.
Lift and cradle, raised and submerged.
The intended boat, drawn to scale.
Flag location, if the cradle extends past 5 ft.
Water-control easements on the lot.
A waterfront project in Plantation may require approvals at the city, county, state and federal level, plus HOA or condominium sign-off where it applies. The path depends on your footprint and the environmental conditions at your shoreline. We map it before we quote, and we manage it through final inspection. The boat lift buyer FAQs explain each agency’s role.
Building, zoning, engineering and electrical approvals, as the project requires.
Environmental review of work in, over and next to surface waters, including lifts and pilings.
Authorization or exemption verification. A state exemption does not cancel local permits.
Work in navigable waters can require Section 10 authorization. Some minor lifts qualify for a general permit.
A lift can have the capacity and still be the wrong physical or legal fit. We confirm projection, side lines, water depth and the permit path before we recommend equipment.
Family-owned and operated in South Florida.
In-house installation. No subcontractors, no hand-offs.
Every installation backed by our Lifetime Workmanship Guarantee.
We install Neptune Boat Lifts, built for saltwater.
The same four steps on every Plantation project, from the first site visit to the service calls that keep your lift running.
We review your boat, your waterfront, and the code for your address, then design the lift or dock around all three.
We prepare the plans and handle the permit path end to end, so nothing gets built before it is approved.
Our own in-house crew builds it. No subcontractors, no hand-offs.
Twice-yearly service keeps your lift running and your warranty records documented.
Whether your canal is tidal or controlled by a drainage or water-control district changes which shoreline rules apply and who reviews the work. We confirm the waterway’s status and the governing standard for your address before we design a lift, dock or seawall repair.
A new lift or dock does not automatically trigger shoreline upgrades. We check your wall’s condition while we are already on site, so there are no surprises after the permit is filed.
The City code sets no numeric maximum or canal-width percentage. Your actual raised and submerged lift and vessel envelope is reviewed for your specific canal, together with any water-control authority.
No. Five feet is the minimum side setback from each property line, and the point where a submerged cradle needs a warning flag at its outer edge.
Foundation design, lift capacity and vessel dead weight, plus surveyed side lines, the seawall cap edge, every piling, the full cradle raised and submerged, the vessel outline, the flag location and any water-control easements.
Yes. A City Building Department permit is required before construction, plus any water-control or outside-agency approval for your canal.
25% of waterway width or 25 ft, whichever is less.
Learn More →
25% lift and vessel envelope, 50% of the waterway kept open.
Learn More →
Every city’s rules side by side in one table.
Learn More →
2026 planning ranges and what moves the final price.
Learn More →
26 answers on sizing, placement, permits and quotes.
Learn More →
Takes about a minute. We reply with next steps.