Home / Seawall Construction & Repair
Seawall repair, cap raising and full replacement across Broward and Palm Beach County, engineered, permitted and built in-house by South Florida’s second-generation marine contractor.
Your elevation, surveyed to NAVD88.
Family-owned marine contractor
Marine contractors
Seawalls, docks and lifts
Financing for qualifying customers
“Marc and his team were communicative, professional, and informative throughout the whole process for my lift. The price was great, and the whole process was surprisingly seamless and stress free. I would recommend to anyone looking for a boat lift or dock.”
“It is a pleasure to write this review. Marc is an excellent professional who is knowledgeable, dedicated, and highly focused. He is a pleasure to work with, and you will be very pleased with your decision to choose him and his company.”
“Marc came through with an excellent job on this lift. It’s hard to find a boss who works with his crew. Great service and quick install. Definitely will be dealing again in the future. Thanks guys.”
“Marc and his team did a great job installing a 15KLB lift for me within the schedule I gave him and on budget. I'm very happy with the work they provided and would highly recommend if you're in the market for a new lift.”
“Would recommend Boat Lift Installers LLC. 10/10 times. Very professional and knowledgeable with lots of experience in the boat lift industry. Recently had a 50,000 lb hurricane lift installed for a large center console and it has worked flawlessly. Mark and his team are punctual, precise, and always available to help and answer questions.”
“Boat lift installers did a phenomenal job at a great and fair price. And delivered on all of their promises. Marc and crew are high quality , high integrity guys for sure”
“Always ready / fast quote/ fast execution… I have good service with Mark, He do my maintenance periodically, I ‘m very happy with him!!”
“Marc always does a great job making sure my lift is at peak performance!”
“They did my lift in Ft. Lauderdale I wouldn’t recommend anyone else! Very respectful when I was asking him questions too!”
Across Broward County, municipalities enforce a minimum tidal flood barrier elevation (in Fort Lauderdale, 5 feet NAVD88 under ULDR § 47-19.13) whenever a seawall is newly built or substantially repaired or rehabilitated. The exact rule depends on which city you’re in. Most homeowners have no idea where their wall stands, or which ordinance applies to their address. We’ll tell you, in writing, before you spend a dollar.
There is no date on the calendar when Broward County comes for your seawall. The rule is not a deadline. It’s a trigger. Fort Lauderdale’s ordinance, ULDR § 47-19.13, sets a minimum elevation of 5 feet NAVD88, or 4 feet for applications filed before January 1, 2035, that are engineered to reach 5 feet by January 1, 2050. It applies only when one of four things happens.
Any new seawall or tidal flood barrier has to be built at the required minimum elevation: 5 feet NAVD88, or 4 feet if your application is in before January 1, 2035, and the structure is engineered to reach 5 feet by January 1, 2050.
Installing a mooring structure attached to your seawall brings the shoreline code into play. Whether it forces a full elevation upgrade depends on how large the work is relative to the cost of a compliant barrier along your shoreline, and it varies by city. It’s a calculation, not a yes or no. (Broward County Code §§ 39-405, 39-406; Fort Lauderdale ULDR § 47-19.13.B, C.12)
Two tests, and either one counts. Length: work along more than 50% of your shoreline’s length. Cost: in Fort Lauderdale, work exceeding 50% of the fair market replacement cost of the existing shoreline structure (ULDR § 47-19.13.C.12); under the County’s standard, work exceeding 50% of the cost of a tidal flood barrier along your shoreline (§ 39-406).
A seawall that allows tidal water onto a neighbor’s property or the public right-of-way is a citable public nuisance. Once cited: 60 days to show progress, 365 days to finish.
City of Fort Lauderdale ULDR § 47-19.13; Broward County Code of Ordinances Ch. 39, Art. XXV, § 39-407. Requirements are adopted and enforced by each municipality and vary accordingly. Oceanfront shorelines seaward of the Coastal Construction Control Line are regulated separately by the State of Florida.
When work crosses the substantial-repair threshold, the code doesn’t just require the repaired section to meet elevation. It requires the barrier to be built along your property’s entire shoreline (Fort Lauderdale ULDR § 47-19.13.D.7; Broward County Code § 39-407(f)).
So the homeowner who planned to fix the failing sixty feet of a hundred-foot wall doesn’t get a sixty-foot job. They get a hundred-foot job, at full elevation, with full permitting.
The failing section is all you meant to fix.
By length, or by cost under your city’s test.
Full elevation, along your whole property line.
This is why we assess the whole shoreline before we quote a single foot of it. You should know the real number before you commit to the small one.
We don’t sub out the hard parts. Assessment, engineering coordination, permitting, demolition, piles, panels, tiebacks, cap and riprap, all in-house, all under one contract.
Raise your existing cap to compliant elevation without replacing the wall, when the structure can carry it. We survey the elevation, verify structural capacity, and tell you honestly whether this is the right call.
Tiebacks and anchors, panel replacement, void and washout repair, crack sealing, weep hole and drainage correction, riprap. The work that buys you years before replacement.
Vinyl sheet pile and concrete panel systems, king piles and structural cap, built to your municipality’s required elevation across the full shoreline, permitted through the city, county, FDEP and the Army Corps.
Seawall, dock and boat lift as a single scope, a single permit package and a single mobilization, all self-performed by our own crews.
Before anyone talks about price, you should know exactly what you have and exactly what your municipality requires. You get it in writing: your actual elevation, your city’s requirement, and an honest recommendation.
On-site visit. Written report. No obligation.
The level of detail on the first visit is the level of detail on your job. Here is what an on-site review with Boat Lift Installers covers, next to a typical estimate.
It depends entirely on the wall. Raising a cap adds height, and height adds weight and overturning load to a wall designed decades ago for neither. That’s a structural determination made on your wall, by measurement. We build caps, tiebacks, panels and full replacements, so we have no product to protect when we recommend one.
Applications submitted before January 1, 2035, may be permitted at 4 feet NAVD88, provided the barrier is designed to accommodate 5 feet NAVD88 by January 1, 2050. Building the lower cap now with the structure to accept the higher one later is the option most homeowners are never offered. We'll price both so you can see the difference.
Our financing partnership with Hearth puts up to $250,000 in project financing behind your seawall, with monthly payments as low as $500 for qualifying customers. Pre-qualify with no credit score impact. Subject to credit approval.
One application covers the full shoreline project.
For qualifying customers.
To pre-qualify.
We survey your elevation to NAVD88, evaluate the structure and identify which code triggers apply to your property.
You get it in writing: current elevation, required elevation, structural findings, our recommendation and a fixed-price scope.
We handle it end to end: the city, the county, FDEP and the Army Corps of Engineers.
Our crews, our equipment. Built to code, inspected and signed off, with your dock and lift handled in the same mobilization if you want them.
★★★★★ 5-star rated on Google
“Marc and his team did a great job installing a 15KLB lift for me within the schedule I gave him and on budget. I’m very happy with the work they provided and would highly recommend if you’re in the market for a new lift.”
Jordan B. · Google review
“Boat lift installers did a phenomenal job at a great and fair price. And delivered on all of their promises. Marc and crew are high quality , high integrity guys for sure”
Steven H. · Google review
“They did my lift in Ft. Lauderdale I wouldn’t recommend anyone else! Very respectful when I was asking him questions too!”
Brandon M. · Google review
It depends on the length of the wall, its condition, access for equipment, and whether the job is a repair, a cap raise or a full replacement, plus engineering and permits. After the on-site assessment you get a written, fixed-price scope.
Many South Florida seawalls last for decades, but the real answer depends on how the wall was built, the water it faces and how it has been maintained. Cracked or displaced panels, voids behind the cap, sinkholes and failing tiebacks are signs a wall is nearing the end of its life.
Keep weep holes clear, watch for new cracks, settlement and soil loss behind the cap, and have the wall checked after major storms. Catching voids and tieback issues early is far less expensive than a replacement.
No. There is no deadline requiring an existing seawall to be raised. The minimum elevation applies when a wall is newly built or substantially repaired or rehabilitated, or when it is cited for allowing tidal water onto a neighbor’s property or the public right-of-way.
Two tests, and either one counts: work along more than 50% of your shoreline’s length, or work above your city’s cost threshold. Cross either line and the wall must meet current elevation along your entire shoreline.
It can, but not automatically. Attaching a mooring structure brings your shoreline under the code. Whether it forces an elevation upgrade depends on the size of the work and your city’s ordinance. We run that check before anything gets ordered.
Sometimes, and it’s meaningfully less expensive when it works. It depends on whether the existing panels, piles and tiebacks can safely carry the added load, which we answer in the assessment.
The Broward County standard does not cover Palm Beach County, where requirements can differ by municipality. We work in Boca Raton, Delray Beach and across Palm Beach County, and confirm exactly what applies to your address.
Neptune Boat Lifts sized to your boat and your waterway, installed by our own crew.
Single, double and triple lifts, custom platforms and decked designs.
Takes about a minute. We reply with next steps.